We Have MOVED

3701 South Rd

Mukilteo, WA 98275

 

Methow River Bridges Structural Rehabilitation Phase 2 - Methow WA

Structural Rehab to 6 bridges on SR 153, between Methow & Twisp.

fpz_20180730_0414.jpg
fpz_20180731_0550.jpg
fpz_20180919_9771.jpg
fpz_20180919_1517.jpg
fpz_20180919_9384.jpg

I-82 Selah Creek Deck Rehabilitation & Bridge Joint Repair - Selah WA.

Work Included waterproof membrane and bridge joint repair. 

CC-SCB-Bridge-12.jpg
CC-SCB-Bridge-11.jpg
CC-SCB-Bridge-8.jpg
CC-SCB-Deck-12.jpg
CC-SCB-Deck-9.jpg
CC-SCB-Deck-6.jpg
CC-SCB-Deck-5.jpg
CC-SCB-Deck-3.jpg

Duwamish River & Interurban Ave Bridge Deck & Joint Rehabilitation - Tukwila WA.

This project was part of a 30M concrete pavement rehabilitation WSDOT job on the NB lanes of I-5. We were a sub contractor to Gary Merlino Construction. The scope of repairs included new waterproof membrane on both the Duwamish River Bridge & the Interurban Ave Bridge with at total surface are of 6,890 Sq. Yd. Along with new bridge joints. Work on this project was confined to 4 weekend closures. 

CC-I5-MEM-17.JPG
CC-I5-MEM-14.JPG
CC-I5-JNT-6.JPG
CC-I5-JNT-19.JPG
CC-I5-JNT-28.JPG
CC-Duwamish-1.jpg
CC-Duwamish-4.jpg
CC-Duwamish-5.jpg
CC-Duwamish-9.jpg
CC-Duwamish-15.jpg
CC-Duwamish-14.jpg
CC-Duwamish-42.jpg

Saltwater State Park Bridge Seismic Retrofit - Des Moines Wa.

CCI was contracted by RCNW to perform all the aerial seismic work on this project. The scope included overhead & vertical concrete repair, epoxy injection, 4 layers of carbon fiber secured with anchor rods on the columns, expansion joint replacement, transverse & longitudinal restrainers, strut & column jackets, new bridge seats and diaphragm extensions, bridge cleaning and painting. This project was a fantastic display of our technical services. 

DSCN0285.JPG
DSC00026.JPG
DSCN0299.JPG
DSC00025.JPG
DSC00021.JPG
DSC00085.JPG
DSC00081.JPG
DSCN0297.JPG
DSC00036.JPG
DSC00038.JPG
DSC00042.JPG
IMG_0097.JPG
DSC00024.JPG
DSC00053.JPG
DSC00070.JPG
DSC00074.JPG
GOPR0016.JPG
DSCF5009.JPG
DSCN0295.JPG
DSC00043.JPG

Skykomish River Bridge Repair - Skykomish WA.

Work was done for Strider Construction on this proect. Scope included preparation & placing a modified concrete eoverlay in two separate staged replacements.

CC-Skykomish_River_Bridge-03.JPG
CC-Skykomish_River_Bridge-04.JPG
CC-Skykomish_River_Bridge-06.JPG
CC-Skykomish_River_Bridge-07.jpg
CC-Skykomish_River_Bridge-11.JPG
CC-Skykomish_River_Bridge-17.jpg
CC-Skykomish_River_Bridge-23.jpg
CC-Skykomish_River_Bridge-10.jpg

I-5 Pacific Avenue Bridge Repairs - Olympia WA.

On this project we performed work on a combined total of 4 bridges along the I-5 corridor through Olympia going Northbound. On the pacific avenue overpass we removed & replaced the existing approach slab, repaired all the expansion joints on the structure and installed new longitutinal joint seals. This work was limited to two weekend closures.

fpz_20170729_0137.jpg
fpz_20170729_0153.jpg
fpz_20170729_0183.jpg
fpz_20170729_0280.jpg
fpz_20170729_0333.jpg
fpz_20170729_0355.jpg
fpz_20170729_0529-32.jpg
fpz_20170729_0534.jpg
fpz_20170729_0577.jpg
fpz_20170729_0605.jpg
fpz_20170729_0627.jpg
fpz_20170729_6107.jpg
fpz_20170729_0634.jpg

Capitol Lake Bridge, I-5 Expansion Joint Replacement - Olympia Wa.

Tucci & Sons contacted us about replacing the expansion joints on the Capitol Lake bridge on I-5 in Olympia as part of a larger paving project. The work was limited to two 48-hour weekend closures. The project Included joint removal, reinforcement installation, casting new headers, and installing the silicone gland joint. 

 

DSCN0039.JPG
DSCN0058.JPG
DSCN0037.JPG
DSCN0055.JPG
DSCN0042.JPG
DSCN0059.JPG
DSCN0136.JPG

I-82, US-12 & !-823 Expansion Joint Replacement - Yakima WA

Combined Construction was a sub contractor for Columbia Asphalt on this project. Our scope included replacing expansion joints on 10 bridges located on US-12 & US-823.

fpz_20170516_9390.jpg
fpz_20170516_9388.jpg
fpz_20170516_00191.jpg
fpz_20170516_00025.jpg
20170516_055820766_iOS.jpg
20170516_045851720_iOS.jpg
20170516_090351446_iOS.jpg
20170518_080849861_iOS.jpg
fpz_20170516_9400.jpg

10th Ave. NW Bridge Repairs - Shoreline Wa.

The project includes concrete restoration on both the bridge deck and soffit including epoxy injection, vertical and overhead patching. Replacement of the drop-in-span, along with new expansion joint systems. Replacement of the bridge deck, including a new waterproof membrane. Guardrail retrofit, balluster repairs and extensive CDF placement throughout the structure.

IMG_1706.JPG
IMG_1702.JPG
IMG_1673.JPG
IMG_1724.JPG
IMG_1792.JPG
IMG_1732.JPG
IMG_1735.JPG
br01.jpg
IMG_1795.JPG
IMG_1826.JPG
IMG_1834.JPG
IMG_1840.JPG
IMG_1761.JPG
IMG_1760.JPG
IMG_1668.JPG
IMG_1664.JPG
IMG_1727.JPG
IMG_1790.JPG
IMG_1831.JPG
IMG_1878.JPG
IMG_1885.JPG
IMG_1880.JPG
br02.jpg

I-90 Westbound - Lake Sammamish Pkwy Overpass Deck & Joint Rehabilitation - Issaquah Wa.

Work on this project was done for Lakeside Industries as part of a larger paving project on I-90 Westbound. Quantities Included 451 Sq. Ft. of deck repair, 2500 Sq. Yd. of waterproof membrane, 160 Ln. Ft. of RCS expansion joint replacement & 160 Ln. Ft. of strip seal replacement.

20160722_094930869_iOS.jpg
IMG_1900.JPG
20160719_074602316_iOS.jpg
IMG_1903.JPG
IMG_1913.JPG
IMG_1910.JPG
IMG_1905.JPG
IMG_1915.JPG
IMG_1923.JPG
IMG_2030.JPG
IMG_2034.JPG
IMG_2047.JPG
br01.jpg
br02.jpg
20160722_094930869_iOS.jpg

Fort Casey Battery Moore Concrete Repair - Coupeville WA.

Combined Construction was awarded the Battery Moore Concrete Repair Project by the Washington State Parks Department. The scope included extensive concrete repair to concrete beams, columns and slabs. We also performed crack repair, and concrete sealing. This work was performed at Fort Casey, which was built in the late 1800's and is a historically registered site.

fpz_20170502_2656.jpg
fpz_20170502_2371.jpg
fpz_20170502_2409.jpg
fpz_20170502_2490.jpg
fpz_20170502_2589.jpg
fpz_20170502_2577.jpg
fpz_20170502_2559.jpg
fpz_20170502_9667.jpg
20170327_173724395_iOS.jpg
20170427_182154115_iOS.jpg
20170427_182702346_iOS.jpg
20170428_212936497_iOS.jpg
20170427_174317090_iOS.jpg
20170427_182256728_iOS.jpg
20170420_160851701_iOS.jpg
20170423_012623110_iOS.jpg
20170423_012928876_iOS.jpg

I-90 Floating Bridge Modified Concrete Overlay - Seattle Wa.

A total of 10 pours were done on this project for IMCO General Contractors. The mix design selected was a 2" silica fume overlay, which was placed with the aid of an Allen Engineering Truss Screed. Work on this project was limited to weekend closures.

IMG_1749.JPG
IMG_1751.JPG
IMG_1738.JPG
IMG_1801.JPG
IMG_1992.JPG
IMG_1994.JPG
IMG_1997.JPG
IMG_1745.JPG
IMG_2274.JPG
IMG_2272.JPG
IMG_2271.JPG

Washington Ave Parking Garage Rehabilitation & Strengthening - Bremerton Wa.

Work Includes repairing 1500 Ln. Ft. of large cracks on the deck of the  parking garage via slotted steel reinforcement crack repair. This repair method includes routing and gravity injecting epoxy into crack, chipping slots 12" on center for a 60" epoxy coated bar to be set in high strength grout. Epoxy Injection and concrete spall repair were also done throughout the garage. To improve the structural integrity of the garage we installed carbon fiber around the elevator shaft, on the lid of the garage on the first level, and all of the perimeter columns on the bottom level. The expansion joint to the entrance of the garage was replaced as part of this contract. Water intrusion remediation work was also done; this included 1,400 Ln. Ft. of chemical grouting, 15,000 Sq. Ft. of cementitious coating (applied with our grout pump) and 15,000 Sq. Ft. of elastomeric coatings.

IMG_2266.JPG
IMG_0004.JPG
IMG_0007.JPG
IMG_2933.JPG
IMG_2932.JPG
IMG_2893.JPG
IMG_2410.JPG
IMG_2402.JPG
pg01.jpg
pg02.jpg
IMG_2261.JPG
pg07.jpg
pg08.jpg
IMG_2265.JPG
IMG_2386.JPG
IMG_2267.JPG
IMG_2387.JPG
pg05.jpg
pg06.jpg
IMG_2912.JPG
IMG_2939.JPG
IMG_2919.JPG

Mellen St. Junction Phase 2 - Skook River Bridge Deck & Joint Rehabilitation- Chehalis Wa.

Scarsella Bros contracted us to replace the strip seal joints on the north & southbound I-5 Skookumchuck River Bridges as part of a 150 Million dollar WSDOT project. We also applied the deck seal material prior to installation of the asphalt.

DSC00147.JPG
DSC00150.JPG
DSC00153.JPG
DSC00155.JPG
DSC00149.JPG
DSC00152.JPG
DSC00157.JPG
IMAG0374.jpg
DSC00190.JPG
DSC00169.JPG
DSC00148.JPG
DSC00181.JPG
DSC00180.JPG
DSC00187.JPG
DSC00192.JPG
DSC00205.JPG

Guinevere Apartments Plaza Waterproofing - Seattle Wa.

This project included membrane removal in the existing plazas and planters. Extensive concrete restoration was done once the membrane was removed. To keep access intact for the residents of the apartments, we did the plaza membrane installation in phases. We were able to do all of the surface preparation and floor drain installation in-house which included shot blasting, core drilling, and drain grouting. 

100_1438.JPG
100_1437.JPG
100_1474.JPG
100_1441.JPG
100_1461.JPG
100_1470.JPG
IMAG0186.jpg
IMAG0183.jpg
IMAG0403.jpg
IMAG0402.jpg
100_1462.JPG
100_1469.JPG
IMAG0404.jpg
prev / next
Back to Featured Projects
fpz_20180919_9773.jpg
5
Methow River Bridges Structural Rehabilitation Phase 2 - Methow WA
CC-SCB-Bridge-8.jpg
8
I-82 Selah Creek Deck Rehabilitation & Bridge Joint Repair - Selah WA.
CC-I5-MEM-17.JPG
12
Duwamish River & Interurban Ave Bridge Deck & Joint Rehabilitation - Tukwila WA.
DSC00038.JPG
20
Saltwater State Park Bridge Seismic Retrofit - Des Moines Wa.
CC-Skykomish_River_Bridge-06.JPG
8
Skykomish River Bridge Repair - Skykomish WA.
fpz_20170729_0605.jpg
13
I-5 Pacific Avenue Bridge Repairs - Olympia WA.
DSCN0056.JPG
7
Capitol Lake Bridge, I-5 Expansion Joint Replacement - Olympia Wa.
fpz_20170516_00080-87.jpg
9
I-82, US-12 & !-823 Expansion Joint Replacement - Yakima WA
IMG_1791.JPG
23
10th Ave. NW Bridge Repairs - Shoreline Wa.
CC-Duwamish-14.jpg
15
I-90 Westbound - Lake Sammamish Pkwy Overpass Deck & Joint Rehabilitation - Issaquah Wa.
fpz_20170502_2656.jpg
17
Fort Casey Battery Moore Concrete Repair - Coupeville WA.
IMG_2274.JPG
11
I-90 Floating Bridge Modified Concrete Overlay - Seattle Wa.
IMG_2919.JPG
22
Washington Ave Parking Garage Rehabilitation & Strengthening - Bremerton Wa.
DSC00158.JPG
17
Mellen St. Junction Phase 2 - Skook River Bridge Deck & Joint Rehabilitation- Chehalis Wa.
IMG_0947.JPG
13
Guinevere Apartments Plaza Waterproofing - Seattle Wa.